Phase 4 closed -- the checkpoint came back refined, not confirmed
- #phase-4
- #checkpoint
- #journal
The honest headline first
Phase 4 was the phase in which this site spent a single reliability-focused iteration on the machine rather than on new mechanism: it authored the dated Phase 3 journal entry and applied the four refinements the Phase 3 checkpoint had carried forward — the three embedded diagram presentations, the one-phase-behind status wording, the Phase 2 journal data alignment, and the replacement of a leaked internal reference on the Status / Roadmap page with the corresponding requirements text. It ran on the carried-forward foundation the earlier phases established: the persistent Runner, bounded attempts, independent review, and a checkpoint at the end, with no new mechanism attached.
What the checkpoint found is the honest part of this record. The phase’s deployed slice came back through the full path — development, independent review, delivery, checkpoint — on a single planned iteration, but the checkpoint did not come back confirmed as-is. It came back refined, because the deployed test site still carried two findings: the Phase 3 journal entry’s statistics were still the earlier figures rather than the verified Phase 3 and Phase 3.1 figures, and the three embedded diagrams’ dark-mode visibility was still a defect. Both are stated below as open, and this entry does not claim them as corrected.
4.1 — The single iteration, and what it did
The phase was a single reliability-focused iteration. Its objective was not to add new mechanism but to carry the four defects the Phase 3 checkpoint named into ordinary checkpoint elaboration and resolve them against the same static generation with no runtime, backend, or database. The delivered output, in the order it landed, contains: the authored Phase 3 journal entry — the dated account of the documentation-and-audit phase, written from the recorded run data rather than reconstructed afterwards; the three embedded diagram presentations, each refined for contained and centred sizing and alignment against the page that uses it; the one-phase-behind status wording on the Status / Roadmap and Factory pages, corrected so the published site documents the previous complete phase; the Phase 2 journal narrative aligned with the recorded run data; and the leaked internal reference on the Status / Roadmap page replaced with the corresponding requirements text. Nothing in Phase 4 required a change to the Factory itself; that is recorded as a finding, not assumed.
4.2 — The iteration path, and what it still needs
The iteration path worked end to end on the one planned iteration: the work went through development, independent review, delivery, and checkpoint, and the built output was deployed to the test site. The phase-boundary handoffs and the closure steps are the part that still needs further normal-operation exercise and correction; they are reported here as observed, not as settled. That is the point of a reliability phase: the single iteration carried cleanly through the machinery, while the handoffs and closure still need to be run and corrected through ordinary operation rather than assumed to have held.
4.3 — The numbers, and what they are and are not
The recorded source-fact statistics below come from the Controller records for the single Phase 4 run. The 16 dispatch attempts are partitioned as 10 succeeded and 6 failed, and the 6 failures are attempts within that one completed run path — not six failed iterations. The one planned iteration is a single iteration record, not a run count, and it is not the same population as the dispatch attempts.
| Run | Dispatch attempts | Succeeded | Failed | Iterations | Checkpoint |
|---|---|---|---|---|---|
| Phase 4, single run | 16 | 10 | 6 | 1 | approved, outcome refined |
The unit separations this record keeps, stated rather than implied:
- The succeeded and failed columns partition the 16 dispatch attempts; the 6 failures are attempts within the one completed run path, not six failed iterations, and they are not counted as six iterations.
- The one planned iteration is a single iteration record. It is not added into, or combined with, the dispatch attempts, and it is not counted as a run.
- No phase-success percentage is derived from these dispatch counts. The recorded figures are counts; a success rate would be derived rather than recorded, so it is not printed. This site does not publish elapsed-time or duration averages either: a duration figure would be invented, so it is not printed.
4.4 — The checkpoint, as recorded
The approved Phase 4 checkpoint outcome is recorded as refined, not confirmed as-is. The phase-boundary handoffs and closure were not yet exercised through to a clean closure in normal operation, and the deployed slice carried the two test-site findings named below. The checkpoint named them as open rather than treating them as resolved, and that is the record’s discipline: the checkpoint states what stays open, and the correction work the following phase is carrying — not this entry — is what will show them resolved.
4.5 — What stays open
Two test-site findings remained open at the Phase 4 checkpoint, and this entry states them as open and does not claim them as corrected:
- The incorrect Phase 3 statistics. The dated Phase 3 journal entry authored in this phase reported the earlier figures rather than the verified Phase 3 and Phase 3.1 breakdown — with the stale-source attempt and the corrected run kept separate and the synthetic acceptance activity kept separate from project delivery. That correction is the work the following phase is carrying.
- The dark-mode diagram visibility. The three embedded diagram presentations were refined for contained and centred sizing and alignment in this phase, but their legibility against the site’s dark background remained a defect at the checkpoint.
These are the findings the following phase is correcting. This entry reports only completed work and observed results: the single iteration, the deployed output, and the refined checkpoint. It does not claim production acceptance, a clean end-to-end success rate, or that the two findings above were fixed — that would be the following phase’s completed-change record to show, not this entry’s. Keeping the states separate — what the phase did, what the checkpoint found, and what the correction pass is carrying — is the record’s discipline.
Related artefacts
- The single Phase 4 iteration record: one planned iteration carried through development, independent review, delivery, and the approved refined checkpoint
- The dated Phase 3 journal entry authored in this phase -- the entry whose statistics the following phase corrects
- The four Phase 3 checkpoint refinements applied in this phase: the three embedded diagram presentations, the one-phase-behind status wording, the Phase 2 journal data alignment, and the leaked internal reference replaced with requirements text
- The Phase 4 approved checkpoint record, outcome refined
- The two open test-site findings this phase does not claim as corrected: the incorrect Phase 3 statistics and the dark-mode diagram visibility