Status / Roadmap
Where this delivery is right now, and what comes next.
Phases 1, 2, and 3 are complete; Phase 4 is underway. Phase 1’s recorded outcome was that the deployment pipeline, the content model, the theming, and the site’s content controls — including the requirement that internal project artifact codes and numbers not be published on the site — were proven working end to end, ahead of full content authoring. Phase 2’s recorded outcome, at its approved checkpoint, was that the delivery moved from human-started runs to runs that run: a locally hosted model running real project work through a persistent, contract-checked, review-gated loop, four iterations in sequence, with a materially improved operational foundation behind it. Phase 3’s recorded outcome, at its approved checkpoint, was that the site documented the experiment from inside — the dated Phase 2 Journal entry, the three Factory process diagrams, the Infrastructure / Lab expansion, and the site’s cleanup and publication checks.
Phase 4 is carrying out the consolidation pass: the dated Journal entry recording Phase 3, and the checkpoint’s minor corrections — diagram presentation, status wording, Phase 2 journal data alignment, and the replacement of a published project code with the corresponding requirements text. Lower-priority additions that Phase 3 deferred are being considered at the checkpoint. This page is part of that consolidation; the dated, item-by-item account of what has actually shipped so far lives in the Journal.
Project and phase lifecycle
The status of the project moves through six stages: human requirements are approved at a gate, the architecture and plan are approved at Gate 2, the work is implemented across phases split into sized iterations, those iterations are reviewed and accepted, the consolidated build is deployed by human promotion, and the approved checkpoint scopes the next phase. The iterative-implementation stage is made of the per-iteration cycle described on the Method page.